Skip to content
Maska
Esc
↑↓navigate↵open⌘Jpreview
On this page

Work steps

Factory tenants only. The steps each production unit does on a piece, with Hindi names and which steps need a photo.

Factory tenants only. Work steps appears for a factory. A restaurant or cafe tenant does not have this page.

Each production unit has a list of work steps: what the unit does to a piece, first to last. You find it under Projects, then Work steps, in the side menu.

What a step holds

  • A name in English.
  • A name in Hindi. This is the line the artisan reads on the phone. Every step needs both names. A step with no Hindi name is not saved.
  • Needs a photo. Turn it on when the artisan must take a photo to mark the step done.

Change a unit’s steps

  1. Open Work steps and press the production unit.
  2. Change a name, turn a photo on or off, move a step up or down, remove a step, or press Add a step.
  3. Press Save steps.

Changes are for new work. A piece already started at the unit keeps the steps it started with.

A unit must have at least one step.

Start from a ready list

There are five ready lists: Woodwork, Metal, CNC, Upholstery and Stone. A new factory’s units start with the list that fits their name. To put a ready list back, open the unit, pick the list under Start from a ready list and press Replace. The list fills the form. Change what does not fit, then press Save steps. Nothing is saved before that: press Cancel and the unit keeps the steps it had.

If someone else saved first

If two people change the same unit at once, the second save is not kept. The page says Someone else changed these steps. Open again. Close the form, open the unit again and make the change on the new list.

Who can do this

The owner and anyone who runs projects can change steps. Accounts can read them.

Coming Soon

How the steps reach the artisan’s phone when a project is marked good for production.

Was this page helpful?